INDUSTRIES — CLEANTECH
Battery storage, backup power, electrification infrastructure and EV
charging built in the UK, from first prototype to volume, without
changing partner mid-ramp.
CERTIFICATIONS & REGISTRATIONS
View Certificates →
01 — WHAT WE BUILD
Built for regulated, high-reliability sectors.
High-current assembly, validated torque control and end-of-line test are common to all five, the differences are in certification targets and ramp profile.
CT.01
C&I battery storage
Commercial and industrial BESS: BMS boards, string controllers, power distribution and enclosure integration. Serialised builds with torque records and insulation-resistance results logged per unit.
BMS PCBA · STRING CONTROL · HV DISTRIBUTION
CT.02
LFP pack integration
Cell-to-pack assembly for LFP chemistries: busbar fitment, cell-voltage harnessing, BMS integration and end-of-line capacity verification — under controlled, documented processes.
MODULE ASSEMBLY · BUSBARS · EOL TEST
CT.03
Backup power
UPS and standby systems for sites that can't lose supply: control electronics, transfer switching assemblies and battery interface boards, with burn-in to your acceptance profile.
UPS CONTROL · TRANSFER SWITCH · BURN-IN
CT.04
Electrification infrastructure
Grid-edge and site electrification hardware: metering and monitoring boards, protection and control assemblies, and heavy-copper power PCBAs for demanding thermal environments.
METERING · PROTECTION & CONTROL · POWER PCBA
CT.05
EV charging
AC and DC charger manufacture from PCBA to boxed, tested product: outdoor-rated conformal coating, firmware load and configuration, and packout direct to installer networks.
AC/DC CHARGERS · COATING · DIRECT FULFILMENT
SOMETHING ELSE?
If it moves, stores or meters energy, we've probably built something like it. Send the files and we'll tell you within 48 hours.
Get a quote →
01 — WHAT WE BUILD
Built for the people
who own the ramp.
CleanTech programmes fail on supply, not solder. These are the four commitments your operations and procurement team will actually hold us to.
Ramp without requalification
Prototype, pilot and volume run on the same lines under the same process controls — scaling is a scheduling decision, not a technical transfer.
Supply chain you can interrogate
Franchised-only sourcing, BOM health monitoring, and honest lead-time reporting — your supply chain director sees what we see.
High-current workmanship, evidenced
Validated torque control, crimp pull-test records and insulation-resistance results logged per serial — the paperwork your warranty case will need.
UK manufacture, shorter loops
Engineering changes turned in days not shipping cycles; no far-east freight exposure on a product line your installers are waiting for.